HVAC | STEAMFITTING | PLUMBING | SHEET METAL

The foundation for a successful project
begins with the Pre-Construction phase.

Prairie Mechanical has working relationships with some of the most prominent general contractors and consulting engineers in the Greater Omaha Area.

We are able to create a collaborative environment during Pre-Construction that focuses on delivering a project that best meets the project owner’s needs. The owner can have confidence that they are getting a project that has found a balance of budget conscience, constructability, lifecycle cost, and ease of operation and maintenance.

expertise to every aspect of the project

CONCEPTUAL
ESTIMATING

Cost control begins with an accurate estimate. When design information is limited, Prairie Mechanical utilizes “conceptual estimating.” To be as accurate as possible, the conceptual estimate should contain as much detail as the final budget. Undefined aspects of the project should be listed as allowances and later modified as the design progresses.

Constructability
Analysis

The most empowering aspect of Pre-Construction is the synergy created when combining the consultant’s design experience with the contractor’s knowledge of materials and methods. Prairie Mechanical works hand-in-hand with the consulting engineer to ensure that the final design is represented in the same configuration as it will be installed.

Project
Scheduling

A well-thought-out project schedule is becoming increasingly more important as owner’s expectations demand aggressive completion dates. Constructing a collaborative schedule with the general contractor can streamline the project workflow by maximizing pre-fabrication opportunities and minimizing over-populated work areas, thus increasing productivity.

Value
Engineering

Construction budgets are becoming increasingly tighter in an unstable economy. Costs of raw materials (e.g. copper pipe and fittings) are on the increase. Prairie Mechanical works with the design team to identify opportunities to draw the project back within budget. Value engineering solutions can be as simple as a change in materials and methods or as complex as changing the mechanical system design.

Aksarben Cinema General Contractor: McNeil Company Builders

Project Value: $225,000

Scope of Work: Sheetmetal
Abraham Lincoln High School Renovation General Contractor: Prairie Construction Company

Project Value: $4,000,000

Scope of Work: Mechanical Piping Sheetmetal
Ameristar Casino Air Quality Improvement General Contractor: Hawkins Construction Company

Project Value: $1,300,000

Scope of Work: Mechanical Piping Sheetmetal
ConAgra Foods General Contractor: Prairie Mechanical Corporation

Scope of Work: Mechanical Piping Sheetmetal
Cooling Coil Replacement General Contractor: Prairie Mechanical Corporation

Project Value: $350,000

Scope of Work: Mechanical Piping Sheetmetal
Generator Plant General Contractor: All Purpose Construction

Project Value: $100,000

Scope of Work: Mechanical Piping Plumbing Sheetmetal